The A4010 Bradenham Road near High Wycombe is shut until Friday 11 December while Network Rail repairs a railway bridge hit by vehicles. The 130 bus is diverted.
The A4010 Bradenham Road near High Wycombe is closed to all traffic until Friday 11 December while Network Rail repairs a railway bridge damaged by vehicles striking it. The closure began on Monday 23 November. Network Rail expects the road to reopen on Saturday 12 December.
The bridge carries the Chiltern main line between High Wycombe and Princes Risborough. Network Rail announced the closure on 20 November. It said the bridge had been damaged by vehicles “despite it’s warning signs and height restrictions which are clearly visible to drivers”.
Overview
- What is shut: the A4010 Bradenham Road at the railway bridge, for motorists, cyclists and pedestrians.
- When: Monday 23 November to Friday 11 December, day and night. Reopening is expected on Saturday 12 December.
- Diversion: signed via the A4010, A413 and A404, and the same in reverse.
- Trains: not affected. Chiltern services keep running over the bridge.
- Buses: the 130 between High Wycombe, Princes Risborough and Aylesbury runs to a temporary timetable, and some stops are not served.
Why the road has to close
Engineers are repairing damaged brickwork on the bridge. Network Rail said a full closure was needed because scaffolding and specialist equipment, including temporary structural supports, have to stand in the carriageway throughout the work.
Emergency services will be let through around the work whenever it is safe, according to the release.
Adam Checkley, Network Rail’s engineering director, said: “These repairs are critical. Closing the road is the only way we can safely position the equipment needed to repair the damage caused by these bridge strikes.”
He added: “This is a reminder of why drivers of large vehicles must know their vehicle’s height and check their route before setting off to avoid unnecessary damage to bridges and the subsequent delay and disruption to local communities.”
Network Rail released the details during Road Safety Week. It recorded 1,706 bridge strikes across Britain in 2025/26, around one every five hours. Those strikes caused 185,319 minutes of delay to rail passengers and cost about £13.25 million in delays, cancellations and repairs, it said.
What it means for you
If you drive between High Wycombe and Princes Risborough, the signed diversion runs via the A4010, A413 and A404, according to Network Rail. Allow extra time, and check Buckinghamshire Council’s roadworks and closures page before you set off.
If you catch the 130, check which version of your bus you are on. The council has published a temporary timetable for 23 November to 11 December, operated by Redline Buses. Journeys take one of two diversions:
- Journeys marked A go via Haw Lane and Bledlow Ridge. They miss the Golden Cross and Ministry Wharf stops in Saunderton, and every stop in Bradenham.
- Journeys marked B go via Bradenham Wood Lane, Walter’s Ash, Naphill, Hughenden Valley and Hughenden Road. They miss every stop on West Wycombe Road and Bradenham Road.
The B journeys stop on Bradenham Wood Lane, where the timetable asks passengers to wait outside the Red Lion pub. The temporary timetable covers weekdays, Saturdays and Sundays. On weekdays the first bus leaves High Wycombe bus station for Aylesbury at 6am.
If you travel by train, nothing changes. Network Rail said services will not be disrupted during the work.
Sources
- Network Rail, Bridge strike damage prompts urgent closure of A4010 near High Wycombe, 20 November 2026, for the dates, the reason, the diversion, the quotes and the national figures. Photographs issued with the release.
- Buckinghamshire Council, 130 temporary timetable for the Bradenham Road closure, read on 27 November 2026, for the bus diversions and times.
- Redline Buses service updates, read on 27 November 2026, which list the 130, 130D and 130M as affected from 23 November to 11 December.
Have your say